Reliable elevator components
for global OEMs and installers
We have direct export experience shipping elevator parts in volume to South Korea. We also support customers worldwide with elevator parts sourcing, customization and export coordination, confirming product and destination requirements for each project.
Supply channels and compatibility are confirmed by brand and model.
More options for your installation
When local sourcing is costly, we help compare original-model and replacement options from Chinese suppliers against your installation requirements.
What to share
- Part model and nameplate photos
- Interfaces, mounting dimensions and site photos
Suitability requires technical confirmation. Costs are based on a full quotation including parts, freight and related charges.
Six systems, one supplier
Buy by system and cut down the number of suppliers you manage. Every part is supplied to EN 81-20/50, ASME A17.1 and CSA B44.
Four reasons procurement gets easier
We are a dedicated sourcing partner, not a single-factory sales rep — we compare factories, audit suppliers and inspect every shipment, so one contact covers your whole BOM.
Full-range, one order
Door, traction, control, car, guide rail and safety systems from a single supplier — one purchase order covers a complete elevator.
Built to your drawing
Send a sample, drawing or physical part. We route it to an audited tooling and machining factory for trial production — first samples in 10 days, private-label packaging supported.
Lead times we put in writing
Part availability and lead times are confirmed for each request.
Batch QC + trial assembly
On-site follow-up at the factory, AQL pre-shipment inspection and trial-assembly verification — inspection reports ship with every batch.
A supply chain you can verify
Partner factories are audited to ISO 9001 and build to EN 81-20/50, ASME A17.1 and CSA B44, with material certificates and inspection reports included.
Third-party type-test reports are available for all safety components, ready for your local acceptance filing.
Send a drawing — first samples in 10 days
You provide a sample, drawing or physical part. After engineering review we route it to the right audited tooling and machining factory — one team follows it end to end, so nothing is lost in translation.
Once you approve the sample we move to batch production with pre-shipment inspection and trial-assembly verification, so parts arrive ready to fit.